By Tasha Anderson for AZBEXย
Theย Arizona Department of Emergency and Military Affairsย is looking for a firm to provide design-build services for the 70KSFย Rita Road Readiness Centerย to be located at 7901 S. Rita Road in Tucson.ย
A Request for Qualifications was recently issued for the design, permitting, site preparation and construction of the new facilityย for theย Arizona Army National Guard.ย
Around the same time last year,ย the Departmentย issued an RFQ for a firm to provide design build criteria consultants and technical advisory servicesย to help create these solicitation documents along with a geotechnical investigation, evaluation criteria, performance specifications and more.ย DWL Architect + Planners, Inc. was awarded that contract. (AZBEX,ย July 26, 2019)ย
Theย proposedย $23M facility will include administrative, supply areas, classrooms, lockers, showers/restrooms, training,ย and kitchen/dining areas for assigned military personnel. โSupporting facilities include military and privately-owned vehicle parking, security fencing, access roads, sidewalks, detached facility sign, and utility connections,โ according to the issuedย RFQ.ย
The proposal method will require two steps or phases as noted in the document. Phase one is the Request for Qualifications that was recently issued. Phase two will allow only three selected firms from phase one to submit formal proposals. The formal RFP stage (phase two) will require, at minimum, an engineering solution,ย pricingย and schedule management.ย
According to the RFQ, National Guard Design Criteria, Department of Defense Minimum Anti-Terrorism/Force Protection, building code and National Guard Bureau measures must be incorporated into the project and minimum LEED Silver certification is required.ย
All statements of qualifications are due no later than 3:00 p.m. on August 28th. The Phase I final list selection and notifications are expected on September 15th. There is no pre-submittal conference scheduled for this RFQ; however, those selected for phase two will attend a site visitย currently scheduled for September 23rdย at 10:00 a.m. The RFP to the selected list is anticipated to be released by September 16th.ย
The schedule is tentatively set to have the selected design-build firm under contract by January 2021, with construction completed by January 2023.ย
NEWS TICKER
- [August 7, 2026] - Developer Planning 71KSF Light Industrial Building in NE Phoenix
- [August 7, 2026] - Gilbert Planning Recommends Rezone for 12-Acre Harvest Grove Commercial Area
- [August 7, 2026] - Lower Basin States Concerned About Colorado River Dams Focus
- [August 7, 2026] - Arizona Projects 08-07-26
- [August 5, 2026] - 20-Unit Affordable Development Planned in Sunnyslope
- [August 5, 2026] - Clark Pacific Planning Coolidge Concrete Plant
- [August 4, 2026] - 320-Acre Warehouse & Data Center Master Plan Proposed in Far West Valley
- [August 4, 2026] - Walmart Planning New Supercenter in SE Tucson
