Awards & Accolades

1. Central Station in downtown Phoenix received an AIA Arizona Merit Award in the Distinguished Architecture category at the 2026 Design Awards. The development, which includes The Maeve and ANOVA, combines housing, retail and office space around an existing bus station and light-rail interchange. Multistudio designed the project, with Layton Construction, GMH Communities, Meyer Borgman Johnson and the City of Phoenix among the project partners.
2. CalPortland Company’s Rillito Cement Plant in Rillito has won an ACA Energy and Environment Award in the Energy Efficiency category for strategic improvements and upgrades to the facility. The award was announced at the American Cement Association’s 2026 fall meeting.
Groundbreakings
3. Liv Communities celebrated the opening of Liv Sky Cottages with a Nov. 10 ribbon-cutting ceremony alongside project partners Capstone Homes and Wespac Construction. The community is Liv’s first single-family rental development in Arizona and its first project in Flagstaff. Located at 2701 S. Woody Mountain Road, the 21.12-acre community has welcomed residents and leased more than 100 of its 203 homes as construction continues toward anticipated completion in 2027.
4. Evergreen Development has broken ground on Black Mountain Marketplace, a 13.3-acre neighborhood shopping center in Cave Creek anchored by a 41.3KSF Mountainside Fitness. The project will also include seven outparcel pads for retail, dining and service uses, with completion expected in summer 2027. Evergreen Development is leading planning, entitlement and construction on behalf of the Bullington family, with A.R. Mays Construction as general contractor, Upward Architects as architect and Hubbard Engineering as civil engineer.
5. The Arizona Department of Transportation will begin a $10.5M replacement of the SR 82 bridge over the San Pedro River in Cochise County in mid-November. The project, located approximately nine miles east of Whetstone, will replace the bridge one side at a time while maintaining alternating one-lane traffic. Construction is expected to continue through fall 2028.
6. Construction began Nov. 2 on site improvements at the Heritage Center, 132 W. Bruce Ave. in Gilbert. Work includes new lighting, ADA accessibility upgrades, signage, drainage improvements and a new wastewater connection to the Oak Street Sewer. The playground is expected to remain closed through early January while the community center stays open.
Completions

7. The Arizona Department of Transportation has completed the new eastbound and westbound Interstate 10 bridges over the Gila River, finishing the first of four segments in the I-10 Wild Horse Pass Corridor Project. Crews began work on the bridges in May 2024, replacing the former structures with wider, higher bridges carrying three lanes in each direction and wider shoulders. Construction on the remaining corridor segments will continue through late 2029, when an additional travel lane is expected to open in each direction between Phoenix and Casa Grande.
8. The Pascua Yaqui Tribe opened Casino Del Sol Vahi Taa’am on Nov. 15 at 1055 W. Grant Road in Tucson following three years of construction. The 153.5KSF project redeveloped the former Century Park 16 movie theater site and includes a 52.5KSF gaming floor. Future phases could add a convention center and resort hotel.
9. Dick’s House of Sport has opened its nearly 120KSF store in Gilbert at 2096 S. Santan Village Pkwy. In addition to retail offerings, the store features a variety of experience-based attractions, including a rock climbing wall, golf simulators, an outdoor turf field and a running track.
10. Whole Foods Market opened a 38.2KSF store Nov. 12 at 7628 E. Indian School Road in Scottsdale’s Downtown East retail center. The store occupies most of the former 50KSF Fry’s Food Store space and anchors the center’s ongoing revitalization. Western Retail Advisors’ Eric Termansen and Neil Board represented Whole Foods in the lease negotiations.
11. RYTAN Construction completed a 17KSF interior renovation of the Agua Fria High School Performing Arts Center at Dysart Road and East Riley Drive in Avondale. The project upgraded seating and accessibility, reconfigured the sound booth and added new finishes, theatrical lighting, rigging, audio and video systems and electrical infrastructure. The renovation was completed at the start of the fall semester and recently unveiled to the public.
12. Nishati Power Technologies opened a 15KSF manufacturing facility at Pecos 17 in Mesa. The facility includes 6.3KSF of manufacturing space and 8.8KSF of testing grounds. The site will support increased production of the company’s hybrid power systems.
13. Copper State Pavement celebrated the grand opening of its new facility at 5340 W. Luke Ave. in Glendale. The company began operating from the site on Sept. 1 and marked the move with a ribbon-cutting hosted by the Glendale Chamber of Commerce.
