By Tasha Anderson for AZBEXย
Developer,ย Marwestย Enterprises, LLCย is planning aย 1.08MSFย industrial project to be located at the NEC of Hawes and Elliot Roads, near the Loop 202 in Mesa.ย
The 74-acre property is located within theย Elliot Road Technology Corridorย and is currently owned byย Loop 202 & Elliot Road Parcel #2 LLC.ย Marwestย under contract to purchase the site is looking to rezone it to Light Industrial with a Planned Area Development Overlay, which would allow the property to โopt-outโ of the corridor. According to the project documents, โThe ability to โopt-inโ is based on the particular type of employment activity that has been defined in the Tech Corridor PAD Overlay, which specifically restricts โindoor warehousing and storageโ as a qualified use.โย
The development, known asย E202, orย Elliot 202, will provide two buildings. Building one will be a total of 460.3KSF and Building two will be 619.9KSF. The new PAD requests a maximum building height of 60 feet, with a 40-foot clearing height, instead of the current 40-foot maximum building height requirement.ย
โThe goal of E202 is to deliver two industrial buildings totaling in more than 1MSF of highly functional and affordable industrial, manufacturing, and distribution space to the Southeast Valley,โ the narrative states. โThese buildings will focus on the demands of tenants wanting anywhere from 115KSF to 1MSF accompanied by great design and attractive aesthetic.โย
With the addition of the new PAD, truck docks and loading bays will be able to be situated toward the Elliot Road frontage along the longer east/west faรงade in the front yard, rather than the rear side of the buildings as required by the currentย developmentย guidelines. The Elliot Road frontage will include an 8-foot CMU wall with enhanced landscaping to screen outdoor storage and truck docks from view.ย
Site improvements for E202 will include the installation of additional traffic lanes, curb, gutter and detached six-foot sidewalk along the north side of Elliot Road and east side of Hawes Road. A total of 873 parking spaces are planned, which is less than the required 1,246 from the current development guidelines.ย
The project was heard at the City of Mesaโs Design Review Board meeting on January 12thย and is expected to be heard at the Planning and Zoning meeting on January 27th. According to the documents, depending on market demand, the buildings may be consolidated into one building and/or the project may be phased.ย
NEWS TICKER
- [August 21, 2026] - New Self-Storage and RV Development Planned in Pinal
- [August 21, 2026] - Maricopa May See New Mountainside Fitness
- [August 21, 2026] - ACC Updates Large-Load Customer Service Agreement Policy
- [August 21, 2026] - UA, Gila River Indian Community Plan 1st in Nation Medical Program
- [August 21, 2026] - Arizona Projects 08-21-26
- [August 19, 2026] - Developer Abandons Ship on Gilbert Surf Park
- [August 18, 2026] - Five-Building Tech Park Planned in Surprise
- [August 18, 2026] - Chandler Council Approves Airport Hangar Development
