News Ticker

Grants Help ADOT Move Arizona Forward

Since 2012, agency has won $43.6M through 15 competitive grants for Arizona projects

ADOT’s competed with 703 total applications worth $10.2B for about $500M in available grant funding in 2012, when $21.6M toward reconstruction of Virgin River Bridge No. 6 along Interstate 15 in far northwest Arizona was awarded. It was the largest amount awarded in that round of TIGER grants. Photo credit: ADOT

Source: Arizona Department of Transportation

An upgrade to high-efficiency LED lighting in a US 60 tunnel east of the Phoenix area. A long-sought bridge to carry SR 347 over railroad tracks in Maricopa. Innovative monitoring technology transmitting real-time data on the structural health of four remote interstate bridges.

Facing limited transportation funding, the Arizona Department of Transportation has been able to move forward with these and other projects benefiting the state because of its success in seeking competitive grants.

Since 2012, ADOT has received a total of $43.6 million through 15 competitive grants, most of them administered by the U.S. Department of Transportation. Much of that amount comes from two grants awarded through USDOT’s highly competitive Transportation Investment Generating Economic Recovery (TIGER) program:

In 2012, $21.6M toward reconstruction of Virgin River Bridge No. 6 along Interstate 15 in far northwest Arizona, the largest amount awarded in this round of TIGER grants. ADOT’s competition: 703 total applications worth $10.2 billion for about $500M in available grant funding.

In 2015, $15M toward construction of a railroad overpass on State Route 347, the only direct route between the city of Maricopa and metro Phoenix. With about $500M available for this round of TIGER grants, USDOT received 627 eligible applications worth $10.1B.

Winning Federal Highway Administration Accelerated Innovation Deployment (AID) Demonstration grants, intended to speed adoption of innovation, helped fund these ADOT projects:

  • $1M toward adding energy-efficient, longer-lasting LED lighting to the Queen Creek Tunnel along US 60 between Globe and Superior.
  • $1M toward construction of a Mohave County bridge along Old Route 66/Oatman Highway using prefabricated bridge elements that expedite the project and minimize the length of road closures. ADOT is administering design and construction for the county.
  • $768,000 toward adding structural health monitoring systems to four I-15 bridges, allowing ADOT engineers in Phoenix to get real-time data on their conditions, identify and address problems quickly and decide when the bridges will need major repairs or replacement.

Many of the grants require a state match. For the $43.6M in grants received since 2012, Arizona provided $49.8M in matching funds.

Read more at ADOT

Leave a comment

Your email address will not be published.


*