News Ticker

Lean Construction Unit 3: Lean Workstructuring

When:
February 21, 2019 @ 7:30 am – 11:30 am
2019-02-21T07:30:00-07:00
2019-02-21T11:30:00-07:00
Where:
SUNDT CONSTRUCTION
2620 S 55th Street
Tempe, Arizona, 85282
United States

Click here to register! 

Unit 3: Lean Workstructuring is the first of two units that introduces the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, instructor-led course describes the process of Lean Workstructuring.

Following this course, you will be able to:

  •      Apply the methods and tools utilized in pull planning
  •      Describe the concept of Lean Workstructuring
  •      Outline the desired outcomes of Lean Workstructuring
  •      Describe the characteristics and application of the Last Planner® System

Includes breakfast & participant’s manual.

Leave a comment

Your email address will not be published.


*